Azim Gostaresh Hormoz

Azim Gostaresh Hormoz

Dock for repairing

Pump room between docks with three main pumps 16000 KV and two sub-pumps 250 KW in addition to other necessary equipment in docking and undocking area.

Main power station 20/63 KV and its transmission line.

Q-wall jetty for operations on water

Dock for shipbuilding

Giraffe crane for repairing dock, shipbuilding dock and Q-wall.

Necessary installation ( such as blast system, fire alarm, fire extinguisher, compressed air, salt water, sweet water and …)

  1. VLCC oil tanker 300000 tons
  2. LNG vessels 140000m³
  3. TEU3500Container vessel 3500 TEU
  4. Bulk carrier in Panamax size
  5. Jack ups(Jack up)
رفتن به بالا
 Iran Shipbuilding & Offshore Industries Complex co
  • fa
  • en